Old 07-19-2014, 03:41 AM
Dot Dot is offline
Tech Curious
Join Date: Jul 2014
Posts: 1
Default Question about continue commands

how can i set a few commands at once
for instance id like to turn on TV then switch to XBMC then turn on lights and play movie
i have all the tasks ready but i dont know how to trigger all together it just trigger the first one
Reply With Quote
Old 12-11-2014, 02:08 PM
MattieB MattieB is offline
Tech Curious
Join Date: Dec 2014
Location: Sacramento, CA
Posts: 1
Wink You can chain them

Having the first call the second (task -> perform task) I'd put some IF's in there, because there are times when you don't want to do them all and you always want to be able to abort the process partway through.

Or, probably the preferred method is to have a master task that fires up the subtasks. Correct me if I'm wrong, but I believe that if you launch a task with a higher priority than the one that calls it, that task will execute before the caller continues.
Reply With Quote

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

All times are GMT -10. The time now is 02:21 PM.

Powered by vBulletin®
Back to Top Copyright © 2006-2016 CrowdGather. All rights reserved. About Pocketables | Advertisers | Investors | Legal | Contact